Assembly & Test Facilities
Eureka Logistics AS, Sørumsand
Sørumsand is the main assembly & test facility for CAPEX projects located in between Oslo and the airport. It consist of 8 000 m2 workshop & assembly area, 1000 m2 warehouse and 1000m2 test bed. The work shop is equipped with balancing machine, lathe and cranes with SWL up to 150 tonnes. The test bed is a state of the art indoor test station in compliance to ISO 9906. It is equipped with load bank, frequency converter, transformers, switchgears and other high and low voltage equipment for testing in compliance with worldwide customer requirements. It also contains test basins with test loop and connection to a 60 m deep hole with 1.8m dia for testing of deep well pump in full length.
The test station is purpose build for testing of Eureka scope of pumps and generator sets with capacities up to 10 000 m3/h and powers up to 3.5 MW with all applicable voltages:
- Full scale testing of firewater pump packages comprising of diesel gensets connected to full length electric submersible pumps.
- Testing of sea water lift pumps in full length. Line shaft pumps and electric submersible pumps.
- Testing of essential and emergency generators.
- Testing of all types of dry mounted pumps.
Eureka Pumps AS, Stavanger
Eureka’s workshop in Risavika close to the Stavanger airport is the main service facility comprising of 1000 m2 workshop, 300 m2 storage area and 600 m2 offices and a test station. The work shop is fully equipped with tools, machines trucks and cranes with SWL up to 15 tonnes. The machine shop consists of balancing, welding and grinding facilities together with lathe, milling and drilling machines.The test station handles dry mounted and submerged pump units up to 2000 m3/h and up to 500 kW.
The Risavika workshop covers all Eureka after market activities in the North Sea.